Zorlu Energy
İkizdere / Rize
| Project |
Zorlu Energy Hydroelectric Power Plant Transmission Line Repair |
| Area |
6000 m2 |
| Project Year |
2017 |
| Applied System |
High Strength Repair Mortars |
Konyaaltı Municipality Expo Pool Construction
Antalya
| Project |
Konyaalti Municipality Expo Park Construction Pool Polyurea and Top Coat Polyaspartic Coating |
| Area |
2900 m2 |
| Project Year |
2016 |
| Applied System |
VIP Quick Seal PP 350, Quick Floor 500 Polyaspartic Topcoat |
Aksa Energy Plant
Göynük/Bolu
| Project |
Demineralized Tank Coating of Aksa Power Plant |
| Area |
800 m2 |
| Project Year |
2014 |
| Applied System |
VIP Quick Spray Industrial, Quick Prime 2K Epoxy System |
Harbin Electric Zetes II Energy Plant
Zonguldak
| Project |
Demineralized and Wastewater Coatings in Zetes II Site. |
| Area |
8000 m2 |
| Project Year |
2016 |
| Applied System |
VIP Quick Spray Industrial, Quick Prime 2K Epoxy System |
Kaya Palazzo Otel
Belek/Antalya
| Project |
Terraces, Flowerpots, Floor Pools Spray Waterproofing with Polyurea |
| Area |
15.000 m2 |
| Project Year |
2013 |
| Applied System |
VIP Quick Seal MP 250 Polyurea System |
Titanic Riverside Otel
Belek/Antalya
| Project |
Terrace Waterproofing with Polyurea |
| Area |
40.000 m2 |
| Project Year |
2012 |
| Applied System |
Quick Sprey Eco Polyurea |